Foothill Parkway over Hagador Canyon Creek
Fair Condition20 years old200 vehicles/day
Location
| State | California |
| County | Riverside |
| Location | 0.6 Mi W/o Lincoln AVE |
| Carries | Foothill Parkway |
| Crosses | Hagador Canyon Creek |
| Coordinates | 33.84192, -117.59821 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 102.4 ft (31.2 m) |
| Max Span | 98.4 ft (30 m) |
| Deck Width | 89.9 ft (27.4 m) |
| Deck Area | 854.9 sq m |
| Main Spans | 1 |
| Year Built | 2006 |
Traffic
| Avg Daily Traffic | 200 (2014) |
| Truck Traffic | 1% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 56C0609 |