Foothill Parkwy NB over Mwd Pipeline
Good Condition9 years old5,000 vehicles/day
Location
| State | California |
| County | Riverside |
| Location | 0.2 Mi S Of Paseo Grande |
| Carries | Foothill Parkwy NB |
| Crosses | Mwd Pipeline |
| Coordinates | 33.86040, -117.61257 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 211.9 ft (64.6 m) |
| Max Span | 91.9 ft (28 m) |
| Deck Width | 44.0 ft (13.4 m) |
| Deck Area | 865.6 sq m |
| Main Spans | 3 |
| Year Built | 2017 |
Traffic
| Avg Daily Traffic | 5,000 (2014) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 921 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 56C0635R |