El Camino Real over Encinitas Creek
Good Condition64 years old29,047 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | At Olivenhain / Leucadia |
| Carries | El Camino Real |
| Crosses | Encinitas Creek |
| Coordinates | 33.06729, -117.26204 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 49.9 ft (15.2 m) |
| Max Span | 24.0 ft (7.3 m) |
| Deck Width | 173.9 ft (53 m) |
| Deck Area | 805.6 sq m |
| Main Spans | 2 |
| Year Built | 1962 (reconstructed 1997) |
Traffic
| Avg Daily Traffic | 29,047 (2020) |
| Truck Traffic | 2% |
| Lanes On Bridge | 10 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57C0189 |