Calle Barcelona over Encinitas Creek
Fair Condition26 years old12,616 vehicles/day
Location
| State | California |
| County | San Diego |
| Location | 275 Ft W/o El Camino Real |
| Carries | Calle Barcelona |
| Crosses | Encinitas Creek |
| Coordinates | 33.07289, -117.26414 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 111.5 ft (34 m) |
| Max Span | 44.0 ft (13.4 m) |
| Deck Width | 81.7 ft (24.9 m) |
| Deck Area | 846.6 sq m |
| Main Spans | 3 |
| Year Built | 2000 |
Traffic
| Avg Daily Traffic | 12,616 (2016) |
| Truck Traffic | 2% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 57C0765 |