Evan Hewes Highway over East Highline Canal
Fair Condition77 years old560 vehicles/day
Location
| State | California |
| County | Imperial |
| Location | 1 Mi E/o Sr-115 Exit I8 |
| Carries | Evan Hewes Highway |
| Crosses | East Highline Canal |
| Coordinates | 32.76680, -115.27180 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 145.0 ft (44.2 m) |
| Max Span | 46.9 ft (14.3 m) |
| Deck Width | 32.5 ft (9.9 m) |
| Deck Area | 437.6 sq m |
| Main Spans | 3 |
| Year Built | 1949 |
Traffic
| Avg Daily Traffic | 560 (2020) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 124 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 58C0070 |