Ramp H over I-25 And Nwp
Good Condition23 years old1,500 vehicles/day
Location
| State | Colorado |
| County | Broomfield |
| Location | EB Nwp Ramp To NB I25 |
| Carries | Ramp H |
| Crosses | I-25 And Nwp |
| Coordinates | 39.98139, -104.99083 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 1359.6 ft (414.4 m) |
| Max Span | 171.3 ft (52.2 m) |
| Deck Width | 30.2 ft (9.2 m) |
| Deck Area | 3812.5 sq m |
| Main Spans | 8 |
| Year Built | 2003 |
Traffic
| Avg Daily Traffic | 1,500 (2018) |
| Truck Traffic | 10% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 12 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 46.43 |