Huron Street over Nwp
Fair Condition24 years old5,000 vehicles/day
Location
| State | Colorado |
| County | Broomfield |
| Location | 0.50 Mi From I25 |
| Carries | Huron Street |
| Crosses | Nwp |
| Coordinates | 39.98340, -104.99719 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 279.9 ft (85.3 m) |
| Max Span | 150.3 ft (45.8 m) |
| Deck Width | 43.0 ft (13.1 m) |
| Deck Area | 1117.4 sq m |
| Main Spans | 2 |
| Year Built | 2002 |
Traffic
| Avg Daily Traffic | 5,000 (2009) |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | NWP-0.50 |