French Street over Blue River
Fair Condition41 years old2,706 vehicles/day
Location
| State | Colorado |
| County | Summit |
| Location | Just West Of Main ST |
| Carries | French Street |
| Crosses | Blue River |
| Coordinates | 39.48707, -106.04686 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 8 (Very Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 100.1 ft (30.5 m) |
| Max Span | 47.6 ft (14.5 m) |
| Deck Width | 44.6 ft (13.6 m) |
| Deck Area | 414.8 sq m |
| Main Spans | 2 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 2,706 (2021) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | BRECK-FRENCH |