Broadway over Highline Canal

Fair Condition68 years old30,424 vehicles/day

Location

StateColorado
CountyArapahoe
LocationJust S Of Arapahoe RD
CarriesBroadway
CrossesHighline Canal
Coordinates39.59452, -104.98828

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure5 (Fair)
Channel/Waterway8 (Very Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialPrestressed Concrete
DesignTee Beam
Total Length35.8 ft (10.9 m)
Max Span33.1 ft (10.1 m)
Deck Width94.5 ft (28.8 m)
Deck Area313.9 sq m
Main Spans1
Year Built1958

Traffic

Avg Daily Traffic30,424 (2021)
Truck Traffic5%
Lanes On Bridge5

Inspection & Ownership

Last InspectionOctober 2023
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberCENT 15-1.9

Nearby Bridges