Broadway over Highline Canal
Fair Condition52 years old35,473 vehicles/day
Location
| State | Colorado |
| County | Arapahoe |
| Location | 0.5 Mi N Of Arapahoe RD |
| Carries | Broadway |
| Crosses | Highline Canal |
| Coordinates | 39.60237, -104.98817 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete |
| Design | Frame |
| Total Length | 41.0 ft (12.5 m) |
| Max Span | 38.4 ft (11.7 m) |
| Deck Width | 90.6 ft (27.6 m) |
| Deck Area | 345 sq m |
| Main Spans | 1 |
| Year Built | 1974 |
Traffic
| Avg Daily Traffic | 35,473 (2021) |
| Truck Traffic | 5% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | CENT 15-2.5 |