Level 4 SW Termina over 84th Avenue
Good Condition12 years old6,884 vehicles/day
Location
| State | Colorado |
| County | Denver |
| Location | SW Corner Term Bldg |
| Carries | Level 4 SW Termina |
| Crosses | 84th Avenue |
| Coordinates | 39.84778, -104.67555 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 438.6 ft (133.7 m) |
| Max Span | 115.5 ft (35.2 m) |
| Deck Width | 39.4 ft (12 m) |
| Deck Area | 1604.4 sq m |
| Main Spans | 4 |
| Year Built | 2014 |
Traffic
| Avg Daily Traffic | 6,884 (2021) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | Other Local Agencies |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | D-31-PB-823A |