Level 5 NW Termina over Terrain
Fair Condition33 years old6,265 vehicles/day
Location
| State | Colorado |
| County | Denver |
| Location | NW Corner Term Bldg |
| Carries | Level 5 NW Termina |
| Crosses | Terrain |
| Coordinates | 39.84999, -104.67515 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Single/Spread |
| Total Length | 123.7 ft (37.7 m) |
| Max Span | 56.4 ft (17.2 m) |
| Deck Width | 39.7 ft (12.1 m) |
| Deck Area | 456.2 sq m |
| Main Spans | 2 |
| Year Built | 1993 |
Traffic
| Avg Daily Traffic | 6,265 (2021) |
| Truck Traffic | 50% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | Other Local Agencies |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | D-31-PB-831 |