E-470 NB over Quincy Avenue

Good Condition29 years old22,265 vehicles/day

Location

StateColorado
CountyArapahoe
Location13.31 Mi From I25
CarriesE-470 NB
CrossesQuincy Avenue
Coordinates39.63814, -104.71894

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length219.5 ft (66.9 m)
Max Span106.6 ft (32.5 m)
Deck Width74.1 ft (22.6 m)
Deck Area1511.9 sq m
Main Spans2
Year Built1997 (reconstructed 2017)

Traffic

Avg Daily Traffic22,265 (2018)
Truck Traffic6%
Lanes On Bridge3
Lanes Under Bridge6

Inspection & Ownership

Last Inspection724
Inspection FrequencyEvery 24 months
OwnerLocal Toll Authority
Historical SignificanceBridge is not eligible for the National Register
Structure NumberE-470-13.31A

Nearby Bridges