17th Street over Greeley No. 3 Ditch
Fair Condition42 years old462 vehicles/day
Location
| State | Colorado |
| County | Weld |
| Location | 0.05 Mi E Of 7th AVE |
| Carries | 17th Street |
| Crosses | Greeley No. 3 Ditch |
| Coordinates | 40.41188, -104.68821 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 27.9 ft (8.5 m) |
| Max Span | 26.2 ft (8 m) |
| Deck Width | 43.0 ft (13.1 m) |
| Deck Area | 111.3 sq m |
| Main Spans | 1 |
| Year Built | 1984 |
Traffic
| Avg Daily Traffic | 462 (2023) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | GREELEY-0000001 |