16th St/9th Ave. over Greeley No. 3 Ditch
Fair Condition41 years old14,200 vehicles/day
Location
| State | Colorado |
| County | Weld |
| Location | 16th St/9th Avenue |
| Carries | 16th St/9th Ave. |
| Crosses | Greeley No. 3 Ditch |
| Coordinates | 40.41423, -104.69298 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 29.5 ft (9 m) |
| Max Span | 29.5 ft (9 m) |
| Deck Width | 208.3 ft (63.5 m) |
| Deck Area | 571.5 sq m |
| Main Spans | 1 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 14,200 (2023) |
| Truck Traffic | 10% |
| Lanes On Bridge | 7 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | GREELEY-000003A |