5th Street over Greeley No. 3 Ditch
Fair Condition66 years old8,191 vehicles/day
Location
| State | Colorado |
| County | Weld |
| Location | 0.3 Mi E Of 23rd AVE |
| Carries | 5th Street |
| Crosses | Greeley No. 3 Ditch |
| Coordinates | 40.42870, -104.71536 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 23.3 ft (7.1 m) |
| Max Span | 20.7 ft (6.3 m) |
| Deck Width | 46.6 ft (14.2 m) |
| Deck Area | 100.8 sq m |
| Main Spans | 1 |
| Year Built | 1960 |
Traffic
| Avg Daily Traffic | 8,191 (2023) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | GREELEY-0000006 |