4th Street over Greeley No. 3 Ditch
Fair Condition56 years old10,732 vehicles/day
Location
| State | Colorado |
| County | Weld |
| Location | 0.81 Mi E Of 35th AVE |
| Carries | 4th Street |
| Crosses | Greeley No. 3 Ditch |
| Coordinates | 40.43024, -104.71970 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 29.9 ft (9.1 m) |
| Max Span | 25.9 ft (7.9 m) |
| Deck Width | 56.1 ft (17.1 m) |
| Deck Area | 155.6 sq m |
| Main Spans | 1 |
| Year Built | 1970 |
Traffic
| Avg Daily Traffic | 10,732 (2023) |
| Truck Traffic | 7% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | GREELEY-0000008 |