I-95 Ramp 313 over Amtrak Railroad
Fair Condition83 years old10,100 vehicles/day
Location
| State | Connecticut |
| County | New London |
| Location | I-95 Exit No. 85 |
| Carries | I-95 Ramp 313 |
| Crosses | Amtrak Railroad |
| Coordinates | 41.36208, -72.07708 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 140.7 ft (42.9 m) |
| Max Span | 68.2 ft (20.8 m) |
| Deck Width | 74.1 ft (22.6 m) |
| Deck Area | 969.5 sq m |
| Main Spans | 3 |
| Year Built | 1943 (reconstructed 2001) |
Traffic
| Avg Daily Traffic | 10,100 (2020) |
| Truck Traffic | 14% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 124 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 01639 |