Interstate-95 NB over Route 12
Fair Condition62 years old31,100 vehicles/day
Location
| State | Connecticut |
| County | New London |
| Location | 0.3 M N Of Thames River |
| Carries | Interstate-95 NB |
| Crosses | Route 12 |
| Coordinates | 41.36425, -72.06748 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 166.0 ft (50.6 m) |
| Max Span | 98.1 ft (29.9 m) |
| Deck Width | 55.4 ft (16.9 m) |
| Deck Area | 855.1 sq m |
| Main Spans | 3 |
| Year Built | 1964 |
Traffic
| Avg Daily Traffic | 31,100 (2023) |
| Truck Traffic | 9% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 01772 |