Interstate-95 NB over SR 900 (kings Highway)
Fair Condition62 years old25,600 vehicles/day
Location
| State | Connecticut |
| County | New London |
| Location | 300 Ft N Of US Route 1 |
| Carries | Interstate-95 NB |
| Crosses | SR 900 (kings Highway) |
| Coordinates | 41.36404, -72.06626 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 92.5 ft (28.2 m) |
| Max Span | 88.3 ft (26.9 m) |
| Deck Width | 55.4 ft (16.9 m) |
| Deck Area | 476.6 sq m |
| Main Spans | 1 |
| Year Built | 1964 |
Traffic
| Avg Daily Traffic | 25,600 (2020) |
| Truck Traffic | 9% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 1 |
Inspection & Ownership
| Last Inspection | 124 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 01773 |