SR 635 over RT 32+ramp 3 I-95 Tr 817
Fair Condition53 years old5,600 vehicles/day
Location
| State | Connecticut |
| County | New London |
| Location | 0.4 Mi N Of I-95 |
| Carries | SR 635 |
| Crosses | RT 32+ramp 3 I-95 Tr 817 |
| Coordinates | 41.37101, -72.10401 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 262.1 ft (79.9 m) |
| Max Span | 140.1 ft (42.7 m) |
| Deck Width | 57.4 ft (17.5 m) |
| Deck Area | 1398.2 sq m |
| Main Spans | 2 |
| Year Built | 1973 |
Traffic
| Avg Daily Traffic | 5,600 (2023) |
| Truck Traffic | 5% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 02897 |