Us-41 over Drainage Canal 055

Fair Condition71 years old3,000 vehicles/day

Location

StateFlorida
CountyCollier
Location14.4 Mi SE Of Sr-951
CarriesUs-41
CrossesDrainage Canal 055
Coordinates25.96046, -81.50018

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignSlab
Total Length60.0 ft (18.3 m)
Max Span15.1 ft (4.6 m)
Deck Width32.8 ft (10 m)
Deck Area183 sq m
Main Spans4
Year Built1955

Traffic

Avg Daily Traffic3,000 (2024)
Truck Traffic17%
Lanes On Bridge2

Inspection & Ownership

Last Inspection323
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number030055

Nearby Bridges