Cr886(gldn Gt Pky) over I-75 And Canal C-1
Good Condition42 years old52,000 vehicles/day
Location
| State | Florida |
| County | Collier |
| Location | 3.4mi West Of Sr-951 |
| Carries | Cr886(gldn Gt Pky) |
| Crosses | I-75 And Canal C-1 |
| Coordinates | 26.17421, -81.73399 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 587.9 ft (179.2 m) |
| Max Span | 108.9 ft (33.2 m) |
| Deck Width | 135.2 ft (41.2 m) |
| Deck Area | 7383.0 sq m |
| Main Spans | 7 |
| Year Built | 1984 (reconstructed 2006) |
Traffic
| Avg Daily Traffic | 52,000 (2022) |
| Truck Traffic | 5% |
| Lanes On Bridge | 7 |
| Lanes Under Bridge | 7 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 030199 |