I-4 WB over Sr-39 & Rr & Frontage RD
Good Condition27 years old62,750 vehicles/day
Location
| State | Florida |
| County | Hillsborough |
| Location | 0.5mi E Of N Alexander ST |
| Carries | I-4 WB |
| Crosses | Sr-39 & Rr & Frontage RD |
| Coordinates | 28.03547, -82.12569 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 395.3 ft (120.5 m) |
| Max Span | 219.2 ft (66.8 m) |
| Deck Width | 87.9 ft (26.8 m) |
| Deck Area | 3229.4 sq m |
| Main Spans | 1 |
| Year Built | 1999 |
Traffic
| Avg Daily Traffic | 62,750 (2024) |
| Truck Traffic | 11% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 100605 |