I-75 SB (sr-93) over Popash Creek
Fair Condition48 years old47,250 vehicles/day
Location
| State | Florida |
| County | Lee |
| Location | 0.1mi. S Of Sr-78 |
| Carries | I-75 SB (sr-93) |
| Crosses | Popash Creek |
| Coordinates | 26.71164, -81.80922 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 405.8 ft (123.7 m) |
| Max Span | 32.2 ft (9.8 m) |
| Deck Width | 80.7 ft (24.6 m) |
| Deck Area | 3043.0 sq m |
| Main Spans | 13 |
| Year Built | 1978 (reconstructed 2015) |
Traffic
| Avg Daily Traffic | 47,250 (2024) |
| Truck Traffic | 16% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 120100 |