SR 80(palm Bch Bl) over Orange River
Good Condition36 years old34,500 vehicles/day
Location
| State | Florida |
| County | Lee |
| Location | 0.4mi East Of I-75 |
| Carries | SR 80(palm Bch Bl) |
| Crosses | Orange River |
| Coordinates | 26.68829, -81.79109 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 799.9 ft (243.8 m) |
| Max Span | 80.7 ft (24.6 m) |
| Deck Width | 123.0 ft (37.5 m) |
| Deck Area | 9142.5 sq m |
| Main Spans | 10 |
| Year Built | 1990 |
Traffic
| Avg Daily Traffic | 34,500 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 6 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 120160 |