Del Prado Blvd. over Bimini Canal
Good Condition66 years old4,200 vehicles/day
Location
| State | Florida |
| County | Lee |
| Location | 100ft S Of Viking Court |
| Carries | Del Prado Blvd. |
| Crosses | Bimini Canal |
| Coordinates | 26.55694, -81.94574 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 3 — Scour critical |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 33.1 ft (10.1 m) |
| Max Span | 33.1 ft (10.1 m) |
| Deck Width | 36.4 ft (11.1 m) |
| Deck Area | 112.1 sq m |
| Main Spans | 1 |
| Year Built | 1960 |
Traffic
| Avg Daily Traffic | 4,200 (2023) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 125608 |