Cr-404(pineda Cwy) over Fec Railway
Good Condition6 years old52,500 vehicles/day
Location
| State | Florida |
| County | Brevard |
| Location | 0.3mi. W/o Us-1 |
| Carries | Cr-404(pineda Cwy) |
| Crosses | Fec Railway |
| Coordinates | 28.20407, -80.66649 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 117.1 ft (35.7 m) |
| Max Span | 117.1 ft (35.7 m) |
| Deck Width | 101.7 ft (31 m) |
| Deck Area | 1106.7 sq m |
| Main Spans | 1 |
| Year Built | 2020 |
Traffic
| Avg Daily Traffic | 52,500 (2024) |
| Truck Traffic | 6% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 704196 |