Malabar RD over Melb Tillman Canal 37
Good Condition54 years old23,000 vehicles/day
Location
| State | Florida |
| County | Brevard |
| Location | 0.1 Mi E Of Minton RD |
| Carries | Malabar RD |
| Crosses | Melb Tillman Canal 37 |
| Coordinates | 27.99908, -80.67167 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 141.1 ft (43 m) |
| Max Span | 35.4 ft (10.8 m) |
| Deck Width | 115.8 ft (35.3 m) |
| Deck Area | 1517.9 sq m |
| Main Spans | 4 |
| Year Built | 1972 (reconstructed 2001) |
Traffic
| Avg Daily Traffic | 23,000 (2024) |
| Truck Traffic | 16% |
| Lanes On Bridge | 7 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 705953 |