Fas03 Dickey Rd#12 over Relief Washington Creek
Fair Condition71 years old150 vehicles/day
Location
| State | Alabama |
| County | Perry |
| Location | Tom Dickey RD |
| Carries | Fas03 Dickey Rd#12 |
| Crosses | Relief Washington Creek |
| Coordinates | 32.50057, -87.34843 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Wood or Timber |
| Design | Stringer/Multi-beam |
| Total Length | 56.1 ft (17.1 m) |
| Max Span | 16.1 ft (4.9 m) |
| Deck Width | 16.7 ft (5.1 m) |
| Deck Area | 87.2 sq m |
| Main Spans | 4 |
| Year Built | 1955 (reconstructed 1984) |
Traffic
| Avg Daily Traffic | 150 (1993) |
| Truck Traffic | 2% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 013121 |