I-75 (sr-93) SB over Snake Creek
Fair Condition44 years old98,323 vehicles/day
Location
| State | Florida |
| County | Broward |
| Location | 1.5 Mi S Of Miramar PKWY |
| Carries | I-75 (sr-93) SB |
| Crosses | Snake Creek |
| Coordinates | 25.95686, -80.35205 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 191.9 ft (58.5 m) |
| Max Span | 64.0 ft (19.5 m) |
| Deck Width | 82.7 ft (25.2 m) |
| Deck Area | 1474.2 sq m |
| Main Spans | 3 |
| Year Built | 1982 |
Traffic
| Avg Daily Traffic | 98,323 (2024) |
| Truck Traffic | 8% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 860327 |