NB I-75 Ramp G-h over Us-27 (sr-25)
Fair Condition44 years old1,200 vehicles/day
Location
| State | Florida |
| County | Broward |
| Location | I-75 Us-27 Interchange |
| Carries | NB I-75 Ramp G-h |
| Crosses | Us-27 (sr-25) |
| Coordinates | 26.14507, -80.44199 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 275.9 ft (84.1 m) |
| Max Span | 92.8 ft (28.3 m) |
| Deck Width | 67.6 ft (20.6 m) |
| Deck Area | 1732.5 sq m |
| Main Spans | 4 |
| Year Built | 1982 |
Traffic
| Avg Daily Traffic | 1,200 (2024) |
| Truck Traffic | 24% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 860335 |