SB Sr7 To WB I-595 over North New River Canal
Fair Condition39 years old3,600 vehicles/day
Location
| State | Florida |
| County | Broward |
| Location | Sr-7 / I-595 Interchange |
| Carries | SB Sr7 To WB I-595 |
| Crosses | North New River Canal |
| Coordinates | 26.08847, -80.20325 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 186.0 ft (56.7 m) |
| Max Span | 62.0 ft (18.9 m) |
| Deck Width | 42.7 ft (13 m) |
| Deck Area | 737.1 sq m |
| Main Spans | 3 |
| Year Built | 1987 |
Traffic
| Avg Daily Traffic | 3,600 (2022) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 860415 |