I-95 To I-195EB over NW 3 AVE
Fair Condition65 years old51,750 vehicles/day
Location
| State | Florida |
| County | Miami-Dade |
| Location | I-95/SR112/I-195 Intrchg |
| Carries | I-95 To I-195EB |
| Crosses | NW 3 AVE |
| Coordinates | 25.81159, -80.20150 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 139.4 ft (42.5 m) |
| Max Span | 63.6 ft (19.4 m) |
| Deck Width | 56.4 ft (17.2 m) |
| Deck Area | 731 sq m |
| Main Spans | 3 |
| Year Built | 1961 (reconstructed 2012) |
Traffic
| Avg Daily Traffic | 51,750 (2023) |
| Truck Traffic | 4% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 870333 |