Sr821 Heft NB 35.2 over Us-27 & Miami Canal
Good Condition4 years old116,100 vehicles/day
Location
| State | Florida |
| County | Miami-Dade |
| Location | 22.3 Miles North Of Us-1 |
| Carries | Sr821 Heft NB 35.2 |
| Crosses | Us-27 & Miami Canal |
| Coordinates | 25.90042, -80.38518 |
Condition Ratings
| Overall Condition | Good |
| Deck | 9 (Excellent) |
| Superstructure | 9 (Excellent) |
| Substructure | 9 (Excellent) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 422.6 ft (128.8 m) |
| Max Span | 124.3 ft (37.9 m) |
| Deck Width | 55.1 ft (16.8 m) |
| Deck Area | 2163.8 sq m |
| Main Spans | 4 |
| Year Built | 2022 |
Traffic
| Avg Daily Traffic | 116,100 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 225 |
| Inspection Frequency | Every 24 months |
| Owner | State Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 870933 |