Courtenay Parkway over Haulover Canal
Fair Condition61 years old675 vehicles/day
Location
| State | Florida |
| County | Brevard |
| Location | 8.6 Miles South Of US 1 |
| Carries | Courtenay Parkway |
| Crosses | Haulover Canal |
| Coordinates | 28.73638, -80.75466 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Steel |
| Design | Movable - Bascule |
| Total Length | 225.4 ft (68.7 m) |
| Max Span | 107.9 ft (32.9 m) |
| Deck Width | 32.8 ft (10 m) |
| Deck Area | 687 sq m |
| Main Spans | 1 |
| Year Built | 1965 |
Traffic
| Avg Daily Traffic | 675 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | NASA |
| Historical Significance | Bridge is eligible for the National Register |
| Structure Number | 703004 |