SR 74 over I-475 (sr 408 Exit 5)

Good Condition61 years old21,300 vehicles/day

Location

StateGeorgia
CountyBibb
Location1 Mi W Of Macon
CarriesSR 74
CrossesI-475 (sr 408 Exit 5)
Coordinates32.83324, -83.73337

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length323.2 ft (98.5 m)
Max Span94.2 ft (28.7 m)
Deck Width80.4 ft (24.5 m)
Deck Area2413.2 sq m
Main Spans4
Year Built1965 (reconstructed 1983)

Traffic

Avg Daily Traffic21,300 (2024)
Truck Traffic1%
Lanes On Bridge5
Lanes Under Bridge6

Inspection & Ownership

Last Inspection124
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000002100400

Nearby Bridges