I-75 over M-3208 Anthony Road
Good Condition56 years old70,100 vehicles/day
Location
| State | Georgia |
| County | Bibb |
| Location | In SE Macon |
| Carries | I-75 |
| Crosses | M-3208 Anthony Road |
| Coordinates | 32.82002, -83.65591 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 165.0 ft (50.3 m) |
| Max Span | 69.9 ft (21.3 m) |
| Deck Width | 113.8 ft (34.7 m) |
| Deck Area | 1745.4 sq m |
| Main Spans | 3 |
| Year Built | 1970 (reconstructed 1995) |
Traffic
| Avg Daily Traffic | 70,100 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 6 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000002100880 |