I-75 Nbl over SR 87 (us 23 Exit 171)

Good Condition61 years old50,800 vehicles/day

Location

StateGeorgia
CountyBibb
Location2 Mi N Of Macon
CarriesI-75 Nbl
CrossesSR 87 (us 23 Exit 171)
Coordinates32.91935, -83.70913

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length255.9 ft (78 m)
Max Span75.1 ft (22.9 m)
Deck Width34.4 ft (10.5 m)
Deck Area819 sq m
Main Spans4
Year Built1965

Traffic

Avg Daily Traffic50,800 (2024)
Truck Traffic1%
Lanes On Bridge2
Lanes Under Bridge4

Inspection & Ownership

Last InspectionDecember 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000002101090

Nearby Bridges