Lp RD Ramp To I-75 over Mud Creek

Good Condition42 years old4,290 vehicles/day

Location

StateGeorgia
CountyClayton
Location0.1 Mi E Of Atl Airport
CarriesLp RD Ramp To I-75
CrossesMud Creek
Coordinates33.64252, -84.40105

Condition Ratings

Overall ConditionGood
Channel/Waterway7 (Good)
Culvert7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length25.9 ft (7.9 m)
Max Span7.9 ft (2.4 m)
Deck Area62.4 sq m
Main Spans3
Year Built1984

Traffic

Avg Daily Traffic4,290 (2024)
Truck Traffic1%
Lanes On Bridge1

Inspection & Ownership

Last Inspection523
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000006301110

Nearby Bridges