Ellenwood Road over I-675 (sr 413)
Fair Condition42 years old15,500 vehicles/day
Location
| State | Georgia |
| County | Clayton |
| Location | 1 Mi SE Of Fort Gillem |
| Carries | Ellenwood Road |
| Crosses | I-675 (sr 413) |
| Coordinates | 33.61169, -84.29634 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 305.1 ft (93 m) |
| Max Span | 163.1 ft (49.7 m) |
| Deck Width | 85.3 ft (26 m) |
| Deck Area | 2,418 sq m |
| Main Spans | 2 |
| Year Built | 1984 |
Traffic
| Avg Daily Traffic | 15,500 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 5 |
| Lanes Under Bridge | 5 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000006301200 |