Bob White Trail over I-75 & M9101 Fr
Good Condition30 years old4,260 vehicles/day
Location
| State | Georgia |
| County | Clayton |
| Location | 0.75 Mi. N. Of SR 3 |
| Carries | Bob White Trail |
| Crosses | I-75 & M9101 Fr |
| Coordinates | 33.59235, -84.38572 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 388.1 ft (118.3 m) |
| Max Span | 128.0 ft (39 m) |
| Deck Width | 43.6 ft (13.3 m) |
| Deck Area | 1573.4 sq m |
| Main Spans | 4 |
| Year Built | 1996 |
Traffic
| Avg Daily Traffic | 4,260 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 13 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000006350430 |