I-75 over SR 3 Northside Parkway
Fair Condition62 years old190,000 vehicles/day
Location
| State | Georgia |
| County | Fulton |
| Location | In N Atlanta |
| Carries | I-75 |
| Crosses | SR 3 Northside Parkway |
| Coordinates | 33.86291, -84.43755 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 299.9 ft (91.4 m) |
| Max Span | 152.9 ft (46.6 m) |
| Deck Width | 175.2 ft (53.4 m) |
| Deck Area | 4880.8 sq m |
| Main Spans | 3 |
| Year Built | 1964 (reconstructed 1983) |
Traffic
| Avg Daily Traffic | 190,000 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 10 |
| Lanes Under Bridge | 5 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000012101550 |