US 41/ SR 3 Ramp T over M-9241 Mt Paran Road

Good Condition39 years old9,130 vehicles/day

Location

StateGeorgia
CountyFulton
LocationIn N Atlanta
CarriesUS 41/ SR 3 Ramp T
CrossesM-9241 Mt Paran Road
Coordinates33.86556, -84.43927

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure8 (Very Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length148.0 ft (45.1 m)
Max Span80.1 ft (24.4 m)
Deck Width33.1 ft (10.1 m)
Deck Area455.5 sq m
Main Spans3
Year Built1987

Traffic

Avg Daily Traffic9,130 (2024)
Truck Traffic1%
Lanes On Bridge1
Lanes Under Bridge4

Inspection & Ownership

Last Inspection623
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000012106260

Nearby Bridges