US 41/ SR 3 Ramp T over M-9241 Mt Paran Road
Good Condition39 years old9,130 vehicles/day
Location
| State | Georgia |
| County | Fulton |
| Location | In N Atlanta |
| Carries | US 41/ SR 3 Ramp T |
| Crosses | M-9241 Mt Paran Road |
| Coordinates | 33.86556, -84.43927 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 148.0 ft (45.1 m) |
| Max Span | 80.1 ft (24.4 m) |
| Deck Width | 33.1 ft (10.1 m) |
| Deck Area | 455.5 sq m |
| Main Spans | 3 |
| Year Built | 1987 |
Traffic
| Avg Daily Traffic | 9,130 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000012106260 |