Baker Street over I-75 + I-75 Ramp
Good Condition39 years old9,320 vehicles/day
Location
| State | Georgia |
| County | Fulton |
| Location | In Atlanta |
| Carries | Baker Street |
| Crosses | I-75 + I-75 Ramp |
| Coordinates | 33.76219, -84.38199 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 391.1 ft (119.2 m) |
| Max Span | 187.0 ft (57 m) |
| Deck Width | 288.7 ft (88 m) |
| Deck Area | 10489.6 sq m |
| Main Spans | 3 |
| Year Built | 1987 |
Traffic
| Avg Daily Traffic | 9,320 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 5 |
| Lanes Under Bridge | 15 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000012106670 |