I-75 (sbl) To SR 1 over I-75 + 2 I-75 Ramps
Good Condition38 years old70,800 vehicles/day
Location
| State | Georgia |
| County | Fulton |
| Location | In Atlanta |
| Carries | I-75 (sbl) To SR 1 |
| Crosses | I-75 + 2 I-75 Ramps |
| Coordinates | 33.75948, -84.37888 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 660.1 ft (201.2 m) |
| Max Span | 190.0 ft (57.9 m) |
| Deck Width | 45.3 ft (13.8 m) |
| Deck Area | 2776.6 sq m |
| Main Spans | 4 |
| Year Built | 1988 |
Traffic
| Avg Daily Traffic | 70,800 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 17 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000012107200 |