Sma 8233;midland B over Phyllis Canal
Fair Condition53 years old8,300 vehicles/day
Location
| State | Idaho |
| County | Canyon |
| Location | N Nampa;midland Blvd. |
| Carries | Sma 8233;midland B |
| Crosses | Phyllis Canal |
| Coordinates | 43.58111, -116.59308 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 22.0 ft (6.7 m) |
| Max Span | 21.0 ft (6.4 m) |
| Deck Width | 65.6 ft (20 m) |
| Deck Area | 134 sq m |
| Main Spans | 1 |
| Year Built | 1973 (reconstructed 1981) |
Traffic
| Avg Daily Traffic | 8,300 (2023) |
| Truck Traffic | 2% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 223 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000021830 |