S3792;uppr Pleasnt over Golden Gate Canal
Fair Condition76 years old280 vehicles/day
Location
| State | Idaho |
| County | Canyon |
| Location | 2.0 S. 5.0 E. Wilder |
| Carries | S3792;uppr Pleasnt |
| Crosses | Golden Gate Canal |
| Coordinates | 43.64761, -116.81175 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 46.9 ft (14.3 m) |
| Max Span | 45.9 ft (14 m) |
| Deck Width | 28.2 ft (8.6 m) |
| Deck Area | 123.0 sq m |
| Main Spans | 1 |
| Year Built | 1950 (reconstructed 1970) |
Traffic
| Avg Daily Traffic | 280 (2023) |
| Truck Traffic | 12% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | Other Local Agencies |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000026875 |