Winnesheik Road over Pink Creek

Good Condition58 years old75 vehicles/day

Location

StateIllinois
CountyStephenson
Location5.0 Mi S Of Davis
CarriesWinnesheik Road
CrossesPink Creek
Coordinates42.34663, -89.41440

Condition Ratings

Overall ConditionGood
Channel/Waterway7 (Good)
Culvert7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length38.7 ft (11.8 m)
Max Span12.1 ft (3.7 m)
Deck Area72.0 sq m
Main Spans3
Year Built1968

Traffic

Avg Daily Traffic75 (2020)
Truck Traffic13%
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 24 months
OwnerTown/Township Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number089502600000000

Nearby Bridges