E. Blair Road over Pink Creek
Good Condition35 years old25 vehicles/day
Location
| State | Illinois |
| County | Stephenson |
| Location | 0.6 Mi E Farwell Br |
| Carries | E. Blair Road |
| Crosses | Pink Creek |
| Coordinates | 42.33213, -89.41439 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 7 (Good) |
| Culvert | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 24.0 ft (7.3 m) |
| Max Span | 11.8 ft (3.6 m) |
| Deck Area | 62.0 sq m |
| Main Spans | 2 |
| Year Built | 1991 |
Traffic
| Avg Daily Traffic | 25 (2020) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 48 months |
| Owner | Town/Township Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 089509900000000 |