E. Blair Road over Pink Creek

Good Condition35 years old25 vehicles/day

Location

StateIllinois
CountyStephenson
Location0.6 Mi E Farwell Br
CarriesE. Blair Road
CrossesPink Creek
Coordinates42.33213, -89.41439

Condition Ratings

Overall ConditionGood
Channel/Waterway7 (Good)
Culvert8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length24.0 ft (7.3 m)
Max Span11.8 ft (3.6 m)
Deck Area62.0 sq m
Main Spans2
Year Built1991

Traffic

Avg Daily Traffic25 (2020)
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 48 months
OwnerTown/Township Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number089509900000000

Nearby Bridges